OpinionPolitics

Dr. Bawumia inspect ongoing works on the 9.5km road linking Misio and Wuyima in the Mamprugu Moaduri district

Apexnewsgh

As part of my visit to the North East Region I spent time to inspect ongoing works on the 9.5km road linking Misio and Wuyima in the Mamprugu Moaduri district as well as the 210 meter bridge linking Misio to Wuyima.

When completed, this will shorten the three and half hours drive time from Walewale to Yagaba to forty minutes and also make it possible for commuters to travel from Walewale to Wa without going through Bolgatanga. It would also open up the vast agricultural potential of the area.

The sub structures of the bridge are complete and as soon as the raining season is over the metal layovers will be latched. This is the first time after independence that any government is attempting to fix this bridge and we are grateful to President Nana Addo Dankwa Akufo-Addo for this. The contractor (Ghacos) has done an excellent job.

Apexnewsgh.com

Ngamegbulam C. S

Leave a Reply